Building with ICF – Phase 2
We have start building with ICF – phase 2! So exciting!
For a chronological listing of our building projects with ICF (or insulated concrete forms), be sure to look through the ICF Building Index.
Finally!
I really can’t believe we have started!
Moving Dirt
Yes, this week John began digging out the dirt to expand the basement walls of our home which overlooks the vineyard! If you have been following our adventure of starting the vineyard and building our own home, you know that we are now living in what will eventually be the basement. We finished phase 1 at the end of 2011.
As you might imagine, we have saved a lot of money by building ourselves and had a lot of fun in the process! But, like everything it takes time and patience. Building the house must fit around vineyard work which pays the bills! So, our primary time to work on the expansion is now, after harvest and before pruning which will begin in late January.
Constructed out of Insulated Concrete Forms (ICF), the house is very well insulated and airtight. That is so important with the high winds we have here in west Texas. We have been so impressed with the ICF that we also used them for our filter house, barn and even the greenhouse.
Not only are the ICF’s known for their insulation value, they are easy to use for DIY’ers like us. They are like big legos that snap together. Once snapped together, the ICF walls are filled with concrete (and some rebar) providing a strong structure. In the links above you can see that we have chosen to finish the exterior walls with EIFS (exterior insulation finishing system) which is a synthetic stucco. We are going for the Tuscan look!
The Plan
Right now, the basement is 1500 sq ft. The plan is to expand three sides 14 ft, pour concrete pads and then put up ICF walls. These new walls will become the exterior walls and support the weight of the upstairs. The windows which you can see in the photos will be removed and replaced with doors leading into the new rooms. Lord willing, we will begin the upstairs next year after grape harvest.
So, here we are, digging out the dirt to expand 14 feet on 3 sides. And, no, we are not using shovels! John and the boys had harvested grapes for a friend who agreed to trade harvesting for use of his backhoe – thanks Steve!
Everyone watched eagerly as the first scoops were dug out.
Well, I said we weren’t using shovels but actually they are being used to dig out the dirt right next to the house. We are using them to avoid any risk of hitting the walls with the backhoe!
The Dirt Mounds are Growing
The dirt mound on the east side of the house has grown considerably since John first began! Once the ICF walls are up and the EIFS applied, the dirt will be pushed back against the walls. It will become a real basement.
The expansion rooms will mainly be used for storage allowing us to remove the shed. But, requests have already been made, especially by the boys, to move their room into the new area. That is definitely a possibility!
Building with ICF – Phase 2 Still in the Works
The digging should be completed in a few more days but we were interrupted this week with some below freezing weather. Freezing weather is no big deal normally, but we had been waiting for it. We needed the cold weather to relocate Brisket to the freezer! And, we did! But, since we finished last night and I have not had time to organize photos and write about it. You must wait until next week to get the details!
Hi folks, We are building with ICF in New Brunswick, Canada, zone 4b to 5 so hoping this house will make or warmer winters than this drafty old farmhouse we are living in. We are building on to our frame rental cottage, which has it’s complications, hoping to see the cement truck to fill the footing course this week.. Enjoying watching your progress.
kathi